0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 1, v. 9
Page(s): 39-41
DOI: 10.2749/101686699780482177
Abstrait:

In November 1995 the design-built contract for the resund Bridge was awarded to Sundlink. The bridge contract includes: a 558-m long viaduct bridge on the artificial island; two approach bridges of 3015 m and 3739 m; and a cable-stayed bridge with a main span of 490 m and a total length of 1090 m. The bridge will carry a four-lane-motorway with emergency lanes, and dual tracks for a high-speed railway. The traffic is arranged in two levels with the roadway on the upper deck and the railway on the lower deck. The rails are laid in ballast over the entire length of the bridge.

Ouvrages et projets

  • Informations
    sur cette fiche
  • Reference-ID
    10000877
  • Publié(e) le:
    17.08.2001
  • Modifié(e) le:
    28.10.2016
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine