0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 1, v. 1
Page(s): 9-11
DOI: 10.2749/101686691780617878
Abstrait:

When constructing bridges over navigable waters of other waterways, it is required that free navigation to be ensured with a view to future development. These requirements are met by providing adequate bridge clearances which depend on the class of the river. Construction of a bridge with a movable span is a possible solution of the task related to the problem of crossing a waterway. The height of other spans of the bridge may only slightly exceed the calculated navigation horizon level. In some cases, this problem may be solved by construction of a subfluvial tunnel. When constructing the movable bridges, a certain technological sequence in spanning the bridge must be observed in order to ensure uninterrupted navigation: a span structure should be installed after the movable span has been completed or the movable span should be installed during an inter-navigation period.

Types d'ouvrages

  • Informations
    sur cette fiche
  • Reference-ID
    10003330
  • Publié(e) le:
    15.09.2002
  • Modifié(e) le:
    27.07.2019
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine