0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 1, v. 1
Seite(n): 9-11
DOI: 10.2749/101686691780617878
Abstrakt:

When constructing bridges over navigable waters of other waterways, it is required that free navigation to be ensured with a view to future development. These requirements are met by providing adequate bridge clearances which depend on the class of the river. Construction of a bridge with a movable span is a possible solution of the task related to the problem of crossing a waterway. The height of other spans of the bridge may only slightly exceed the calculated navigation horizon level. In some cases, this problem may be solved by construction of a subfluvial tunnel. When constructing the movable bridges, a certain technological sequence in spanning the bridge must be observed in order to ensure uninterrupted navigation: a span structure should be installed after the movable span has been completed or the movable span should be installed during an inter-navigation period.

Bauwerkstypen

  • Über diese
    Datenseite
  • Reference-ID
    10003330
  • Veröffentlicht am:
    15.09.2002
  • Geändert am:
    27.07.2019
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine