Deflection Mechanism and Treatment Technology of Permanent Derrick of Freeze Sinking on Deep Alluvium

Auteur(s):




Médium: article de revue
Langue(s): anglais
Publié dans: Advances in Civil Engineering, , v. 2019
Page(s): 1-10
DOI: 10.1155/2019/1362628
Abstrait:

Aiming at the problems of deflection and operation safety of permanent derrick of freeze sinking shafts, the mechanism analysis of uneven settling of the derrick foundations in frost-thawed soil was conducted. In addition, research on ground stabilization and derrick deviation rectification technologies was also studied in this paper based on the engineering practice of derrick of auxiliary shaft in the Dingji Coal Mine. Firstly, since the soil texture and artificial freeze temperature field are uneven, the bearing capacity and compression modulus of soil mass decrease after freeze thawing, resulting in uneven settlement of the foundation soil of the derrick footing and causing the deflection of the derrick. The finite element numerical analysis indicates that, in the event of uneven settling, the greatest tensile stress in the derrick structure of Dingji auxiliary shaft increased by 39.83% and the largest pressure stress increased by 33.33%. Secondly, this study used sleeve valve pipe single-fluid static pressure grouting technology to reinforce the foundation of the derrick footing. The reinforced depth of grouting is 32 m, and every derrick foundation has adopted three circles of grouting holes for grouting reinforcement. Meanwhile, the hydraulic synchronous jacking system was used to rectify the deviation of the derrick, restoring the centre line of derrick ascension to the original design state. Finally, the practice of grouting, foundation consolidation, and derrick deviation rectification projects of the Dingji auxiliary shaft suggest that, after grouting reinforcement, the rate of foundation settlement is gradually decreased and tends to be stable. This has resulted in uniform settlement, and through four basic jacking, the deflection of the derrick has been corrected to its initial design state.

Copyright: © 2019 Zhishu Yao et al.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10299102
  • Publié(e) le:
    06.02.2019
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine