Publié dans: Lean Construction Journal
Page(s): 38-45
DOI: 10.60164/96h4f9b4a
Abstrait:

The Lean Construction Institute’s (LCI) goal is to develop and deploy a new way of thinking about and practicing project management. Projects are conceived as temporary production systems, to be designed in light of the relevant ‘physics’ of the task to be accomplished. It is claimed that complex, quick, and uncertain projects cannot be managed in traditional ways. Detailed CPM schedules, after-the-fact tracking, earned value analysis, and competitive bidding are inadequate to the challenge of today’s dynamic projects. There are four roots of this Lean Construction approach: success of the Toyota Production System, dissatisfaction with project performance, efforts to establish project management on a theoretical foundation, and the discovery of facts anomalous (impossible to explain) from the perspective of traditional thinking and practice. The last of these four is explored in this paper, which presents the current state of construction management thinking as one of conflict between competing paradigms.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.60164/96h4f9b4a.
  • Informations
    sur cette fiche
  • Reference-ID
    10763080
  • Publié(e) le:
    13.02.2024
  • Modifié(e) le:
    13.02.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine