Cheon-Sa Bridge (Section I), Hybrid Cable-Stayed Bridge Anchored to FCM Pier-Table

Auteur(s): (DM Engineering Co., Ltd., Seoul, Republic of Korea)
(DM Engineering Co., Ltd., Seoul, Republic of Korea)
(DM Engineering Co., Ltd., Seoul, Republic of Korea)
(DM Engineering Co., Ltd., Seoul, Republic of Korea)
(Daewoo Engineering & Construction Co., Ltd, Seoul, Republic of Korea)
(Daewoo Engineering & Construction Co., Ltd, Seoul, Republic of Korea)
Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 3, v. 31
Page(s): 1-4
DOI: 10.1080/10168664.2020.1843212
Abstrait: Cheon-Sa Bridge (Section I), completed and opened traffic in 2019, is a FCM (free cantilever method)-anchored hybrid two-pylon cable-stayed bridge with a main span of 510 m. A distinct feature of the bridge is its high (195 m) and low (135 m) pylons with three bundles of cables anchored to the pier-tables of side spans. This exceptional structural scheme gives drastic improvement of structural safety during construction stage as well as enhancement of bridge aesthetics. The link is directly exposed to the Yellow Sea and the site is characterized by strong winds during typhoon events.

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1080/10168664.2020.1843212.
  • Informations
    sur cette fiche
  • Reference-ID
    10606771
  • Publié(e) le:
    15.05.2021