0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Cheon-Sa Bridge (Section I), Hybrid Cable-Stayed Bridge Anchored to FCM Pier-Table

Autor(en): (DM Engineering Co., Ltd., Seoul, Republic of Korea)
(DM Engineering Co., Ltd., Seoul, Republic of Korea)
(DM Engineering Co., Ltd., Seoul, Republic of Korea)
(DM Engineering Co., Ltd., Seoul, Republic of Korea)
(Daewoo Engineering & Construction Co., Ltd, Seoul, Republic of Korea)
(Daewoo Engineering & Construction Co., Ltd, Seoul, Republic of Korea)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 3, v. 31
Seite(n): 1-4
DOI: 10.1080/10168664.2020.1843212
Abstrakt: Cheon-Sa Bridge (Section I), completed and opened traffic in 2019, is a FCM (free cantilever method)-anchored hybrid two-pylon cable-stayed bridge with a main span of 510 m. A distinct feature of the bridge is its high (195 m) and low (135 m) pylons with three bundles of cables anchored to the pier-tables of side spans. This exceptional structural scheme gives drastic improvement of structural safety during construction stage as well as enhancement of bridge aesthetics. The link is directly exposed to the Yellow Sea and the site is characterized by strong winds during typhoon events.

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1080/10168664.2020.1843212.
  • Über diese
    Datenseite
  • Reference-ID
    10606771
  • Veröffentlicht am:
    15.05.2021
  • Geändert am:
    27.08.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine