Woo Jong Kim
- Cheon-Sa Bridge (Section I), Hybrid Cable-Stayed Bridge Anchored to FCM Pier-Table. In: Structural Engineering International, v. 31, n. 3 (Juli 2021). (2021):
- Behaviour of prestressed concrete bridges considering construction stages. Vorgetragen bei: IABSE Colloquium: Structural Concrete, Stuttgart, Germany, 1991. (1991):
- (2012): Structural Characteristics of 3-Pylon Cable-Stayed Bridge Applying UHPC. Vorgetragen bei: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- (2012): DMSUS, Shape-Finding Program for Irregular Suspension Bridge. Vorgetragen bei: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- Gyopo Bridge: A Double-Tied Arch Bridge in Poseung–Pyeongtaek Railroad. In: Structural Engineering International, v. 22, n. 1 (Februar 2012). (2012):
- The Construction of Geogeum Bridge with Large Segment. In: Structural Engineering International, v. 22, n. 1 (Februar 2012). (2012):