Change Orders on Road Maintenance Contracts: Causes and Preventive Measures
Auteur(s): |
Kabindra K. Shrestha
(Project Engineer, Gunda Corporation, Engineers, Planners, and Managers, 4505 S. Maryland Pkwy., Las Vegas, NV 89154; formerly, Graduate Assistant, Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Neva)
Pramen P. Shrestha |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, août 2019, n. 3, v. 11 |
Page(s): | 04519009 |
DOI: | 10.1061/(asce)la.1943-4170.0000299 |