Change Orders on Road Maintenance Contracts: Causes and Preventive Measures

Author(s): (Project Engineer, Gunda Corporation, Engineers, Planners, and Managers, 4505 S. Maryland Pkwy., Las Vegas, NV 89154; formerly, Graduate Assistant, Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Neva)
ORCID (Associate Professor, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154 (corresponding author))
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 11
Page(s): 04519009
DOI: 10.1061/(asce)la.1943-4170.0000299
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000299.
  • About this
    data sheet
  • Reference-ID
    10579932
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine