Case Study: Ground Improvement of Yangtze River Floodplain Soils with Combined Vacuum and Surcharge Preloading Method
Auteur(s): |
Jianwen Ding
(Associate Professor, Institute of Geotechnical Engineering, School of Transportation, Southeast Univ., No. 2, Si Pai Lou, Xuanwu District, Nanjing 210096, China (corresponding author))
Xing Wan (Graduate Student, Institute of Geotechnical Engineering, School of Transportation, Southeast Univ., Nanjing 210096, China.) Chongqi Zhang (Master, Institute of Geotechnical Engineering, School of Transportation, Southeast Univ., Nanjing 210096, China.) Zhijiang He (Graduate Student, Institute of Geotechnical Engineering, School of Transportation, Southeast Univ., Nanjing 210096, China.) Lun Zhao (Graduate Student, Institute of Geotechnical Engineering, School of Transportation, Southeast Univ., Nanjing 210096, China.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | International Journal of Geomechanics, décembre 2019, n. 12, v. 19 |
Page(s): | 05019008 |
DOI: | 10.1061/(asce)gm.1943-5622.0001516 |
- Informations
sur cette fiche - Reference-ID
10606218 - Publié(e) le:
08.05.2021 - Modifié(e) le:
08.05.2021