0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Case Study: Ground Improvement of Yangtze River Floodplain Soils with Combined Vacuum and Surcharge Preloading Method

Autor(en): ORCID (Associate Professor, Institute of Geotechnical Engineering, School of Transportation, Southeast Univ., No. 2, Si Pai Lou, Xuanwu District, Nanjing 210096, China (corresponding author))
(Graduate Student, Institute of Geotechnical Engineering, School of Transportation, Southeast Univ., Nanjing 210096, China.)
(Master, Institute of Geotechnical Engineering, School of Transportation, Southeast Univ., Nanjing 210096, China.)
(Graduate Student, Institute of Geotechnical Engineering, School of Transportation, Southeast Univ., Nanjing 210096, China.)
(Graduate Student, Institute of Geotechnical Engineering, School of Transportation, Southeast Univ., Nanjing 210096, China.)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: International Journal of Geomechanics, , n. 12, v. 19
Seite(n): 05019008
DOI: 10.1061/(asce)gm.1943-5622.0001516
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)gm.1943-5622.0001516.
  • Über diese
    Datenseite
  • Reference-ID
    10606218
  • Veröffentlicht am:
    08.05.2021
  • Geändert am:
    08.05.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine