Auteur(s): |
T. Takaku
K. Fujimara S. Ogaya |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Structural Engineering International, février 1994, n. 1, v. 4 |
Page(s): | 34-36 |
DOI: | 10.2749/101686694780602079 |
Abstrait: |
A study was initiated in 1989 to develop new steel fabrication facilities. A production line with automated laser cutting and material handling equipment and a box girder panel manufacturing line, including pre-fitting, welding, reforming and drilling equipment was installed in 1991. This facility modernisation programme has followed the installation in 1992 of a programme to establish a comprehensive system for bridge manufacture that includes the entire process of production control, materials ordering, pre-fitting, assembly, welding, painting and shipment. These efforts mark a major step towards new production methods for the future. |