0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 1, v. 4
Seite(n): 34-36
DOI: 10.2749/101686694780602079
Abstrakt:

A study was initiated in 1989 to develop new steel fabrication facilities. A production line with automated laser cutting and material handling equipment and a box girder panel manufacturing line, including pre-fitting, welding, reforming and drilling equipment was installed in 1991. This facility modernisation programme has followed the installation in 1992 of a programme to establish a comprehensive system for bridge manufacture that includes the entire process of production control, materials ordering, pre-fitting, assembly, welding, painting and shipment. These efforts mark a major step towards new production methods for the future.

  • Über diese
    Datenseite
  • Reference-ID
    10003519
  • Veröffentlicht am:
    19.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine