0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Analyzing the Ultimate Capacity of a Precast Segmental Box Girder Bridge

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 4, v. 6
Page(s): 255-258
DOI: 10.2749/101686696780496120
Abstrait:

The Second Stage Expressway System (SES) in Bangkok, Thailand includes approximately 32 km of elevated roadway. The precast segmental portion consisted of approximately 1,130 spans ranging in length from 24.9 m to 48.7 m, with a typical span length of 45 m. Because of the large investment involved, it was cost-effective to produce a prototype test span that could confirm the adequacy of the design.

  • Informations
    sur cette fiche
  • Reference-ID
    10003672
  • Publié(e) le:
    19.09.2002
  • Modifié(e) le:
    28.10.2016
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine