Analyzing the Ultimate Capacity of a Precast Segmental Box Girder Bridge
Autor(en): |
D. Tassin
B. Dodson T. Takebayashi |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Structural Engineering International, November 1996, n. 4, v. 6 |
Seite(n): | 255-258 |
DOI: | 10.2749/101686696780496120 |
Abstrakt: |
The Second Stage Expressway System (SES) in Bangkok, Thailand includes approximately 32 km of elevated roadway. The precast segmental portion consisted of approximately 1,130 spans ranging in length from 24.9 m to 48.7 m, with a typical span length of 45 m. Because of the large investment involved, it was cost-effective to produce a prototype test span that could confirm the adequacy of the design. |