0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1976
Completion: 1977
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , , ,
Crosses:
  • Wabash River
Carries:
  • U.S. Route 136
Coordinates: 40° 8' 26.60" N    87° 24' 20.63" W
Show coordinates on a map

Technical Information

Dimensions

total length 285 m
span lengths 28.50 m - 4 x 57.00 m - 28.50 m
number of spans 6
height above valley floor or water ca. 11 m
deck deck width 14.17 m

Materials

deck prestressed concrete

Notes

First bridge in the United States build using the incremental launching method.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004046
  • Published on:
    01/07/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine