0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Viaduc sur l'Indre à Montbazon

General Information

Beginning of works: 1976
Completion: 1977
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , , ,
Crosses:
  • Indre River
Carries:
  • Autoroute A10
Part of:
Coordinates: 47° 17' 1.62" N    0° 40' 52.76" E
Show coordinates on a map

Technical Information

Dimensions

total length 184.70 m
span lengths 35.70 m - 2 x 43.00 m - 40.00 m - 23.00 m
number of spans 5
total width 19.84 m
deck deck depth 2.80 m

Materials

deck prestressed concrete

Participants

Owner
Concessionaire
Structural engineering
Contractor
Launching

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20011019
  • Published on:
    14/12/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine