General Information
Completion: | 20 May 1987 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Precast segmental construction |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bideford, Devon, South West England, England, United Kingdom |
---|---|
Crosses: |
|
Coordinates: | 51° 1' 46.26" N 4° 12' 3.39" W |
Technical Information
Dimensions
total length | 650 m | |
main spans | 3 x 90 m | |
clearance | 24 m | |
number of spans | 8 | |
deck | deck width | 13.3 m |
Materials
superstructure |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Torridge Bridge: Construction of Substructure and Deck Precasting Work. In: Proceedings of the Institution of Civil Engineers, v. 88, n. 2 (April 1990), pp. 211-231. (1990):
- Torridge Bridge: Design. In: Proceedings of the Institution of Civil Engineers, v. 88, n. 2 (April 1990), pp. 191-210. (1990):
- Torridge Bridge: Erection of Superstructure. In: Proceedings of the Institution of Civil Engineers, v. 88, n. 2 (April 1990), pp. 233-260. (1990):
- About this
data sheet - Structure-ID
20006199 - Published on:
14/10/2002 - Last updated on:
04/02/2019