General Information
Status: | in use |
---|
Project Type
Structure: |
U-shaped girder bridge |
---|---|
Support conditions: |
for registered users |
Function / usage: |
Tramway, light or metro rail bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Precast segmental construction |
Location
Location: |
La Florida, Santiago, Santiago, Chile |
---|---|
Part of: | |
Supports: |
Elisa Correa Metro Station (2005)
Hospital Sótero del Río Metro Station (2005) Los Quillayes Metro Station (2005) Protectora de la Infancia Metro Station (2005) Rojas Magallanes Metro Station (2005) San José de la Estrella Metro Station (2009) Trinidad Metro Station (2005) |
Coordinates: | 33° 35' 43.89" S 70° 34' 43.28" W |
Coordinates: | 33° 32' 1.37" S 70° 35' 37.66" W |
Technical Information
Dimensions
length | 7 km | |
number of tracks | 2 | |
standard span lengths | 36 m |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Design
-
SYSTRA
- Daniel Dutoit (designer)
- Serge Montens (designer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20081875 - Published on:
15/11/2021 - Last updated on:
15/11/2021