General Information

Name in local language: Sandauer Brücke
Beginning of works: December 2007
Completion: September 2009
Duration of works: 21 months
Status: in use

Project Type

Awards and Distinctions

2012 nominated  

Location

Location: , , ,
Address: B 107
Crosses:
  • Havel River
Coordinates: 52° 49' 22.16" N    12° 4' 22.93" E
Show coordinates on a map

Technical Information

Dimensions

total length 125.298 m
span lengths 90.602 m - 34.696 m
number of spans 2
bridge surface 1 692 m²
deck deck width 13.50 m

Quantities

sheet piling 1 841 m²
foundations concrete volume 336 m³
reinforcing steel 41 t
substructure concrete volume 1 850 m³
reinforcing steel 238 t
superstructure structural steel 800 t
concrete volume 550 m³
reinforcing steel 150 t

Cost

cost of construction Euro 10 000 000

Materials

arches steel
piles reinforced concrete (C 35/45)
deck slab reinforced concrete (C 35/45)
abutments reinforced concrete (C 30/37)
pier reinforced concrete (C 30/37)
girders steel

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20059309
  • Published on:
    29/01/2011
  • Last updated on:
    05/08/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine