0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Pöppelmannbrücke
Beginning of works: 1 July 1716
Completion: January 1719
Status: in use

Project Type

Function / usage: Road bridge
Structure: approach viaducts:
Semi-circular arch bridge
Material: approach viaducts:
Masonry bridge
Structure: original configuration:
Truss bridge
current configuration:
Half-through arch bridge

Location

Location: , , ,
Crosses:
  • Mulde River
Coordinates: 51° 14' 17.84" N    12° 44' 0.82" E
Show coordinates on a map

Technical Information

Dimensions

main span 30 m
total length 140 m
number of spans 6
deck deck width 5.80 m
approach viaducts
span lengths 10.95 - 14.10 m

Materials

arches stone
truss wood

Chronology

1813

During a battle with Napoleon, the wooden central span burns to destruction.

1816

Reconstruction of the wooden central span.

1894

Replacement of the central span by a steel truss. Widening of the bridge.

1945 — 1947

Temporary bridges and reconstruction.

15 April 1945

German troops destroy the central span.

4 July 1972

Replacement of the central span with an orthotropic deck.

August 2002

Heavy scouring of pier P 50 during the record floods damages the bridge severely.

Participants

Reconstruction (2012)
Owner
Design
Structural engineering
Co-contractor
Steel construction
Construction supervision

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001698
  • Published on:
    10/08/2001
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine