General Information
Project Type
Structure: |
Simple (primitive) suspension bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Steel bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Rutsiro, West Province, Rwanda |
---|---|
Location description: | The bridge crosses the Sebeya river. |
Coordinates: | 1° 46' 22.93" S 29° 22' 30.26" E |
Technical Information
Dimensions
span | 58 m |
Materials
cables |
steel wire
|
---|---|
anchorages |
reinforced concrete
|
deck flooring |
eucalypt hardwood
|
Notes
The bridge built by Bridges to Prosperity serves around 12145 people in the communities of kazo, Gashihe , Nkuna and Gisayo.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20084705 - Published on:
25/01/2023 - Last updated on:
27/01/2023