0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 6 June 2019
Completion: 21 August 2019
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Sebeya river.
Coordinates: 1° 46' 22.93" S    29° 22' 30.26" E
Show coordinates on a map

Technical Information

Dimensions

span 58 m

Materials

cables steel wire
anchorages reinforced concrete
deck flooring eucalypt hardwood

Notes

The bridge built by Bridges to Prosperity serves around 12145 people in the communities of kazo, Gashihe , Nkuna and Gisayo.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084705
  • Published on:
    25/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine