General Information
Other name(s): | Central Viaduct Bridge; Innerbelt Bridge |
---|---|
Beginning of works: | 30 May 2011 |
Completion: | 24 September 2016 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Steel bridge |
Structure: |
Deck arch bridge |
Location
Location: |
Cleveland, Cuyahoga County, Ohio, USA |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Replaces: |
Innerbelt Bridge (1959)
|
Coordinates: | 41° 29' 16.02" N 81° 41' 25.47" W |
Technical Information
Dimensions
eastbound bridge | ||
---|---|---|
main span | 110 m | |
height | 41 m | |
total length | 1 194 m | |
westbound bridge | ||
height | 41 m | |
total length | 1 325 m |
Cost
eastbound bridge | ||
---|---|---|
cost of construction | United States dollar 273 000 000 | |
westbound bridge | ||
cost of construction | United States dollar 293 000 000 |
Case Studies and Applied Products
Prefabricated tendons for George V. Voinovich Bridge in Cleveland, USA
The George V. Voinovich Bridge is part of the I-90 Interstate in Cleveland, Ohio, carrying vehicular traffic across the Cuyahoga River. The five lane structure replaces a truss bridge built in 1959 that had ... [more]
Participants
Owner
1st construction phase (2011-2013)
Design
Contractor
2nd construction phase (2014-2016)
Design
Checking engineering
Co-contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Committee recommends single tower for Cleveland bridge. In: Bridge Update, n. 63 (October 2006), pp. 4.
- About this
data sheet - Structure-ID
20024688 - Published on:
03/11/2006 - Last updated on:
05/12/2017