• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Share

Follow

Dnipropetrovsk Railroad Bridge

General Information

Beginning of works: 1881
Completion: 18 May 1884
Status: in use

Project Type

Structure: Through truss bridge
Vertical lift bridge
Function / usage: upper deck:
Tramway, light or metro rail bridge
upper deck:
Road bridge
lower deck:
Railroad (railway) bridge
Material: Steel bridge

Location

Location: , ,
Crosses:
  • Dnepr River
Coordinates: 48° 29' 14.64" N    35° 1' 38.70" E
Show coordinates on a map

Technical Information

Dimensions

width 15.5 m
total length 1 395 m

Materials

truss steel

Advertisement

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20013138
  • Date created
    30/08/2004
  • Last Update
    28/01/2018