General Information
Completion: | 2015 |
---|---|
Status: | in use |
Project Type
Structure: |
Simple (primitive) suspension bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Steel bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Chapare, Cochabamba, Bolivia |
---|---|
Coordinates: | 17° 4' 42.38" S 65° 3' 45.82" W |
Technical Information
Dimensions
span | 89 m |
Materials
cables |
steel wire
|
---|---|
anchorages |
reinforced concrete
|
Notes
The bridge built by Bridges to Prosperity serves around 1500 people.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20084856 - Published on:
25/01/2023 - Last updated on:
27/01/2023