Life Cycle Cost Analysis of Ashore Marine Engine Room

Author(s): ORCID


Medium: journal article
Language(s): English
Published in: Advances in Civil Engineering, , v. 2022
Page(s): 1-9
DOI: 10.1155/2022/7237281
Abstract:

This paper aims to present a method for comparing decision options for the ashore marine engine room. Based on the life cycle cost system, the life cycle stages are divided into design, acquisition, installation, operation, maintenance, and scrapping. A model of the life cycle cost of ashore marine engine room considering the time value of money was developed, and a calculation method for sensitivity analysis was developed. Regarding the actual case, the life cycle cost of the two options was estimated, the sensitivity of the cost of the two options was analyzed, and control recommendations were made. The results show that Option 2, with the highest initial investment, is the optimal solution, attributed to using an advanced two-stroke diesel engine with reduced operation and maintenance costs. This will be useful for reference by maritime academies.

Copyright: © Long Lyu et al. et al.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10679024
  • Published on:
    18/06/2022
  • Last updated on:
    10/11/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine