0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en): ORCID


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Advances in Civil Engineering, , v. 2022
Seite(n): 1-9
DOI: 10.1155/2022/7237281
Abstrakt:

This paper aims to present a method for comparing decision options for the ashore marine engine room. Based on the life cycle cost system, the life cycle stages are divided into design, acquisition, installation, operation, maintenance, and scrapping. A model of the life cycle cost of ashore marine engine room considering the time value of money was developed, and a calculation method for sensitivity analysis was developed. Regarding the actual case, the life cycle cost of the two options was estimated, the sensitivity of the cost of the two options was analyzed, and control recommendations were made. The results show that Option 2, with the highest initial investment, is the optimal solution, attributed to using an advanced two-stroke diesel engine with reduced operation and maintenance costs. This will be useful for reference by maritime academies.

Copyright: © Long Lyu et al. et al.
Lizenz:

Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden.

  • Über diese
    Datenseite
  • Reference-ID
    10679024
  • Veröffentlicht am:
    18.06.2022
  • Geändert am:
    10.11.2022
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine