Control geométrico del tramo atirantado del Puente de la Constitución de 1812 sobre la Bahía de Cádiz
Author(s): |
Juan Antonio Navarro González-Valerio
C. Lucas Serrano |
---|---|
Medium: | journal article |
Language(s): | Spanish |
Published in: | Hormigón y acero, January 2016, n. 278-279, v. 67 |
Page(s): | 143-158 |
DOI: | 10.1016/j.hya.2016.03.005 |
Abstract: |
Geometric control of the Constitución de 1812 cable-stayed Bridge over the Cadiz BayGeometric control of bridges erected using the balanced cantilever method is always complex. In this case, this has been compounded by the great structural flexibility, weight, and dimensions of the erected segments and the cable-stayed cross-section scheme.These uncertainties, added to the process of obtaining the geometry of the tower and deck, can be fully adjusted if an exhaustive control of all bridge elements is performed throughout the entire construction sequence.The rationale was based on the detailed prior segment assembling in the dockyard, and its positioning using an angle relative to the previously erected deck, establishing some adjustments to eliminate the calculated deviations. A special procedure was established for the geometric control of the joints between different decks in order to adjust precisions to welding tolerances. |
Keywords: |
cable-stayed Geometric control Prior segment assembling in dockyard Relative angle Segments erection
|
Structures and Projects
- About this
data sheet - Reference-ID
10075456 - Published on:
27/03/2018 - Last updated on:
07/10/2018