Automatic device arrangement and wiring for fire alarm systems in metro stations: A case study
Author(s): |
Ruiying Jin
Junjie Li Hongxin Wang Jiefan Gu Yuancheng Li Junyu Chen Peng Xu Ting Lin Wei Lyu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Building Engineering, November 2024, v. 97 |
Page(s): | 110617 |
DOI: | 10.1016/j.jobe.2024.110617 |
- About this
data sheet - Reference-ID
10798459 - Published on:
23/09/2024 - Last updated on:
23/09/2024