Challenges in the Design and Construction of the Queensferry Crossing

 Challenges in the Design and Construction of the Queensferry Crossing
Author(s):
Presented at IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, published in , pp. 2685-2692
DOI: 10.2749/stockholm.2016.2684
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.18 MB

The Queensferry Crossing is Scotlands largest infrastructure project in a generation. It will replace the existing Forth Road Bridge which has suffered deterioration to many components in recent ye...
Read more

Bibliographic Details

Author(s): (Ramboll, London, UK)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Published in:
Page(s): 2685-2692 Total no. of pages: 8
Page(s): 2685-2692
Total no. of pages: 8
Year: 2016
DOI: 10.2749/stockholm.2016.2684
Abstract:

The Queensferry Crossing is Scotlands largest infrastructure project in a generation. It will replace the existing Forth Road Bridge which has suffered deterioration to many components in recent years. Predictions of cable deterioration to the existing suspension bridge indicated that weight restrictions were likely towards the end of this decade, and the loss of such a vital link was considered intolerable.

This paper explains the background to the project and describes key aspects and challenges in the design of this unique bridge, from the designer’s perspective, with a focus in particular on the challenges in the design and erection of the bridges superstructure which is presently under construction.

Keywords:
design methods construction maintenance inspection cable-stayed SHMS