Xiamen
-
Ruan, Yilong / Xu, Wangtu (Ato) (2018): Causes of structural defects to bus rapid transit (BRT) facilities: Example of Xiamen BRT system. Dans: Construction and Building Materials, v. 184 (septembre 2018), pp. 705-712.
https://doi.org/10.1016/j.conbuildmat.2018.06.230
-
Zhao, Jinpeng / Tan, Zhongsheng / Yu, Rongsen / Li, Zonglin / Zhang, Xurui / Zhu, Pengcheng (2022): Deformation responses of the foundation pit construction of the urban metro station: A case study in Xiamen. Dans: Tunnelling and Underground Space Technology, v. 128 (octobre 2022), pp. 104662.
https://doi.org/10.1016/j.tust.2022.104662
-
Li, Ting / Xu, Min / Xiong, Sen (2016): Design and analysis of Xiamen North Railway Station. Présenté pendant: IABSE Conference: Bridges and Structures Sustainability - Seeking Intelligent Solutions, Guangzhou, China, 8-11 May 2016, pp. 851-858.
https://doi.org/10.2749/222137816819259293
-
Yunsun, Ding / Chu, Frank / Yanbin, Zhao / Gengqi, Liu / Yixiong, Guo / Haoguang, Li (1999): The Design of a 155m Long-Span Hangar for Xiamen Taikoo Aircraft Maintenance Base. Dans: International Journal of Space Structures, v. 14, n. 3 (septembre 1999), pp. 191-195.
https://doi.org/10.1260/0266351991494812
-
Chen, Yameng / Wang, Chen / Yap, Jeffrey Boon Hui / Li, Heng / Zhang, Songjiang (2020): Emergency evacuation simulation at starting connection of cross-sea bridge: Case study on Haicang Avenue Subway Station in Xiamen Rail Transit Line. Dans: Journal of Building Engineering, v. 29 (mai 2020), pp. 101163.
https://doi.org/10.1016/j.jobe.2019.101163