Manitoba
-
Stevenson, Sarah A. / Miller, Connell S. / Sills, David M. L. / Kopp, Gregory A. / Rhee, Daniel M. / Lombardo, Franklin T. (2023): Assessment of wind speeds along the damage path of the Alonsa, Manitoba EF4 tornado on 3 August 2018. Dans: Journal of Wind Engineering and Industrial Aerodynamics, v. 238 (juillet 2023), pp. 105422.
https://doi.org/10.1016/j.jweia.2023.105422
-
Ezisi, Uzo / Issa, Mohamed H. (2019): Case study application of prevention through design to enhance workplace safety and health in Manitoba heavy construction projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 46, n. 2 (février 2019), pp. 124-133.
https://doi.org/10.1139/cjce-2017-0454
-
Lees, Kevin / Clark, Shawn P. / Malenchak, Jarrod / Chanel, Paul (2021): Characterizing Ice Cover Formation during Freeze-Up on the Regulated Upper Nelson River, Manitoba. Dans: Journal of Cold Regions Engineering, v. 35, n. 3 (septembre 2021).
https://doi.org/10.1061/(asce)cr.1943-5495.0000254
-
Markowsky, John W. / Woytowich, David L. / Goulter, Ian C. (1990): Development of a portable direct filtration water treatment plant in northern Manitoba. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 17, n. 5 (octobre 1990), pp. 724-729.
https://doi.org/10.1139/l90-085
-
Esplanade Riel Fußgängerbrücke, Winnipeg, Manitoba. DSI erhält Auszeichnung (Award of Excellence) als bester Subunternehmer
(Best Trade Contractor) für Produkte und Ausführungsarbeiten an der neuen
Schrägseil-Fußgängerbrücke in Winnipeg. Dans: DSI Info, n. 14 ( 2006- 2007), pp. 56-57.