West Tsing Yi Viaduct
- Cutting edge. Dans: Bridge Design & Engineering, v. 10, n. 35 (2e trimestre 2004), pp. 22-25, 27.
- Mass movement. Modern equipment for segmental construction is flexible and offers many different options for bridge erection. Dans: Bridge Design & Engineering, v. 11, n. 40 (3e trimestre 2005), pp. 46-49. (2005):