Pont Geobukseon
- Second Dolsan Bridge: A Cable-Stayed Bridge with a Concrete Edge Girder. Dans: Structural Engineering International, v. 22, n. 1 (février 2012), pp. 44-48. (2012):
- Second site. A new birdge is being built beween Yeosu and Dolsan Island in South Korea to provide extra capacity during the 2012 Expo. Dans: Bridge Design & Engineering, v. 15, n. 56 (3e trimestre 2009), pp. 34-35. (2009):