Oakley Clark Collins Memorial Bridge
-
Haji Agha Mohammad Zarbaf, Seyed Ehsan / Norouzi, Mehdi / Allemang, Randall J. / Hunt, Victor J. / Helmicki, Arthur / Venkatesh, Chandrasekar (2018): Ironton-Russell Bridge: Application of Vibration-Based Cable Tension Estimation. Dans: Journal of Structural Engineering (ASCE), v. 144, n. 6 (juin 2018), pp. 04018066.
https://doi.org/10.1061/(asce)st.1943-541x.0002054
-
Tiberio, Terrence / Salvadori, Joseph / Schemmann, Armin (2005): Singe issue. Dans: Bridge Design & Engineering, v. 11, n. 40 (3e trimestre 2005), pp. 28-30.
-
Potucek, Jindrich / Pfuntner, Jerry (2023): Stay-cable Bridge Construction Accelerated. The New Bridge over the Ohio River. Présenté pendant: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, pp. 434-442.
https://doi.org/10.2749/istanbul.2023.0434