Niagara Tunnel
-
Krenn, Harald / Roner, Manfred / Bauert, Michael / Wannenmacher, Helmut (2013): Deformation measurement and long-term behaviour of passively prestressed pressure tunnels through the example of the Niagara Tunnel Facility Project / Verformungsmessung und Langzeitverhalten von passiv vorgespannten Druckstollen am Beispiel des Niagara Tunnel Facility Projekt. Dans: Geomechanics and Tunnelling, v. 6, n. 5 ( 2013), pp. 398-406.
https://doi.org/10.1002/geot.201300042
-
Li, Edward / Everdell, Rick (2010): Maximizing Waters of the Niagara River for Power Generation: Challenges Constructing the Niagara Tunnel Intake Approach. Présenté pendant: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 690-691.
https://doi.org/10.2749/222137810796063328
-
Gschnitzer, Ernst / Rojas, Pedro (2008): Niagara Tunnel Facility Project - NFTP. Dans: Austrian Nationtal Committee of ITA (2008): The Austrian Art of Tunnelling. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wisenschaften GmBH und Co. KG, Berlin (Allemagne), ISBN 978-3-433-02924-4, pp. 164-165.
-
Sir Adam Beck Generating Complex Expansion – Niagara Tunnel Project. Dans: Felsbau, v. 24, n. 6 ( 2006), pp. 55.
-
Gschnitzer, E. / Goliasch, R. (2009): TBM modification for challenging rock conditions - a progress report of the Niagara Tunnel Project (NTP) / TBM-Umbau unter schwierigen Gebirgsbedingungen - ein Baubericht über das Niagara Tunnel Projekt (NTP). Dans: Geomechanics and Tunnelling, v. 2, n. 2 ( 2009), pp. 168-178.
https://doi.org/10.1002/geot.200900016