Ligne 5 du métro de Riyad
-
Ramos Schneider, Gonzalo / Garcia-Fontanet Molina, Angel / Torralba Mendiola, Victor / Ainchil Lavin, Javier (2018): Innovative solutions for intersection of TBM tunnel and station in Riyadh Line 5 metro. Dans: Tunnelling and Underground Space Technology, v. 80 (octobre 2018), pp. 26-37.
https://doi.org/10.1016/j.tust.2018.05.024
-
Lorenzo-Romero, José-Maria / Sanchez-Jimenez, Jose-Luis / Gomez Elvira, Alberto (2016): Line 5 Riyadh Metro Tunnel and Deep Underground Stations. Présenté pendant: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 2703-2710.
https://doi.org/10.2749/stockholm.2016.2702
-
Torralba Mendiola, Victor / Ramos Schneider, Gonzalo / Garcia-Fontanet Molina, Angel / Arranz Marco, Tomás / Plana Aguilar, Didac / Ainchil Lavin, Javier (2017): Soluciones innovadoras en el cruce de túneles y estaciones l5 metro Riyadh. Présenté pendant: VII Congreso Internacional de Estructuras, Congreso de la Asociación Científico-Técnica del Hormigón Estructural (ACHE), A Coruña, 20-22 de junio de 2017.