Breakthrough Ceneri Base Tunnel
We look back to an amazing event. Around 1'500 project participants followed the final blast in the west tube of the Ceneri Base Tunnel. The breakthrough took place with great accuracy: the horizontal deviation was 2 cm and vertically 1 cm.
|
D'autres médias pour cet ouvrage |