Tunnelling and Underground Space Technology - v. 16, n. 2 (avril 2001)
Publié: | avril 2001 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Palmström, Arild / Singh, Rajbal | The deformation modulus of rock masses — comparisons between in situ tests and indirect estimates | 115-131 |
Sharma, J. S. / Hefny, A. M. / Zhao, J. / Chan, C. W. | Effect of large excavation on deformation of adjacent MRT tunnels | 93-98 |
Li, X. B. / Summers, D. A. / Rupert, G. / Santi, P. | Experimental investigation on the breakage of hard rock by the PDC cutters with combined action modes | 107-114 |
Wong, I. H. | Methods of resisting hydrostatic uplift in substructures | 77-86 |
Coutts, D. R. / Wang, J. / Cai, J. G. | Monitoring and analysis of results for two strutted deep excavations using vibrating wire strain gauges | 87-92 |
Goel, R. K. | Status of tunnelling and underground construction activities and technologies in India | 63-75 |
Jiang, Y. / Yoneda, H. / Tanabashi, Y. | Theoretical estimation of loosening pressure on tunnels in soft rocks | 99-105 |