Proceedings of the Institution of Civil Engineers - v. 66, n. 3 (août 1979)
Publié: | août 1979 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Shepherd, R. / Brown, H. E. E. / Wood, J. H. | Dynamic Investigations of the Mohaka River Bridge | 457-469 |
Duvivier, S. / Henstock, P. L. | Installation of the Piled Foundations and Production Modules on Occidental's Piper a Platform | 407-436 |
Cuthbert, E. W. | The Jubilee Line: 1. The project | 359-374 |
Lyons, A. C. | The Jubilee Line: 2. Construction from Baker Street to Bond Street Exclusive andfrom Admiralty Arch to Aldwych | 375-394 |
Bubbers, B. L. | The Jubilee Line: 3. Construction from Bond Street Station to Admiralty Arch | 395-406 |
Parsons, A. F. | Practical Engineering Aspects of the Lee Valley Artificial Groundwater Recharge Pilot Scheme | 471-483 |
Morris, M. E. / Hannant, R. B. | Some Aspects of the Design and Construction of the 17th July Bridge at Northgate, Baghdad | 437-456 |
Howard, D. F. / Clerk, D. | Tyne and Wear Metro: Dugald Clerk Lecture | 349-358 |