Proceedings of the Institution of Civil Engineers - Geotechnical Engineering - v. 158, n. 2 (avril 2005)
Publié: | avril 2005 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Nip, D. C. N. / Ng, C. W. W. | Back-analysis of laterally loaded bored piles | 63-73 |
Houlsby, G. T. / Byrne, B. W. | Design procedures for installation of suction caissons in clay and other materials | 75-82 |
Kyrou, K. / Penman, A. / Artemis, C. | The first 30 years of Lefkara Dam | 113-122 |
Mavroulidou, M. / Gunn, M. J. / Woods, R. I. | Numerical modelling of groundwater pumping processes | 83-93 |
Chapman, D. N. / Rogers, C. D. F. / Ng, P. C. F. | Predicting ground displacements caused by pipe-splitting | 95-106 |
Lim, W. L. / McDowell, G. R. / Collop, A. C. | Quantifying the relative strengths of railway ballasts | 107-111 |