Proceedings of the Institution of Civil Engineers - Bridge Engineering - v. 160, n. 1 (mars 2007)
Publié: | mars 2007 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Oliver, A. | design and construction of Itford Farm Bridleway Bridge | 17-24 |
Biliszczuk, J. / Barcik, W. / Hawryszków, P. / Sadowski, K. / Tadla, J. | Examples of new built footbridges in Poland | 37-42 |
Toumazis, A. D. | Garyllis River Footbridge—harmonising engineering and architectural features | 1-7 |
Gordon, S. R. / May, I. M. | Precast deck systems for steel-concrete composite bridges | 25-35 |
Czarnecki, A. A. / Nowak, A. S. | Reliability-based evaluation of steel girder bridges | 9-15 |