Proceedings of the Institution of Civil Engineers - Bridge Engineering - v. 160, n. 2 (juin 2007)
Publié: | juin 2007 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Jones, S. W. / Wrigley, R. G. | Design and construction of the Metrolink Finback Bridge | 71-79 |
Staquet, S. / Kalogiannakis, G. / Detandt, H. / Van Hemelrijck, D. / Espion, B. | Field testing of a 30-year-old composite Preflex railway bridge | 89-98 |
Roberts, C. / Hanson, A. / Henderson, D. / Bell, G. | Jamestown Viaduct, UK: strengthening of an early steel viaduct | 57-63 |
Melbourne, C. / Wang, J. / Tomor, A. K. | new masonry arch bridge assessment strategy (SMART) | 81-87 |
Sreeves, J. C. | Reconstruction of Bryn-y-Felin Railway Bridge, Snowdonia | 49-55 |
Bell, G. / Anderson, B. / Rocke, R. | UB 30/274 Daer Viaduct replacement | 65-69 |