Proceedings of the Institution of Civil Engineers - Bridge Engineering - v. 163, n. 4 (décembre 2010)
Publié: | décembre 2010 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Morgenthal, G. / Yamasaki, Y. | Behaviour of very long cable-stayed bridges during erection | 213-224 |
Astin, D. / Xie, H. / Gillarduzzi, A. | Design and construction of Third Karnaphuli Bridge, Bangladesh | 161-171 |
Khan, S. Z. | Design audit of the Phu My cable-stayed bridge, Vietnam | 203-211 |
Low, A. McC. | The design of small suspension bridges | 197-202 |
Young, J. S. / Lynch, M. J. | Inspection and maintenance of Severn Bridge suspension cables | 173-180 |
Cocksedge, C. / Hudson, T. / Urbans, B. / Baron, S. | M48 Severn Bridge – main cable inspection and rehabilitation | 181-195 |
Professor Benjamin Isaac George Barr, 1942–2010 | 241-242 | |
Walker, C. / Stafford, P. J. | use of modal-combination rules with cable-stayed bridges | 225-240 |