Proceedings of the Institution of Civil Engineers - Bridge Engineering - v. 164, n. 3 (septembre 2011)
Publié: | septembre 2011 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Andersen, Ib Blom / Jensen, Michael Birk | Bridge crossing of the River Nidelva, Trondheim, Norway | 157-165 |
Ledsham, Gareth R. / Tall, Lawrence / Armstrong, Chris | Diglis swing bridges, UK – a case study of movable timber bridges | 167-181 |
Thorogood, Michael | Mechanical issues to consider when designing a moving bridge | 105-113 |
Catbas, F. Necati / Gokce, Hasan Burak / Gül, Mustafa / Frangopol, Dan M. | Movable bridges: condition, modelling and damage simulations | 145-155 |
Hołowaty, Janusz | Poland's only movable railway bridge still in use | 115-121 |
Thulstrup, Michael / Nielsen, Jens Praest / Nilsson, Mattias / Hällmark, Robert | Railway bridge over Södertälje Canal, Sweden | 123-132 |
Cutter, Jerry / Flanagan, John W. / Brown, Philip / Rando, Mario / Mo, Gaute | Samuel Beckett Bridge, Dublin, Ireland | 133-144 |
Tindall, Philip | Te Wero Bridge, Auckland, New Zealand | 93-104 |