Proceedings of the Institution of Civil Engineers - Bridge Engineering - v. 171, n. 2 (juin 2018)
Publié: | juin 2018 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Barnes, Jeremy Nigel / Gill, John Christopher | design and construction of the Pont Briwet Viaduct, UK | 80-90 |
Duguid, Brian / Hyde, Jason / Pullan, Howard | Innovative digital design delivery for the Ordsall Chord in Manchester, UK | 91-105 |
Thomson, James C. / Robinson, Andy / Howe, Christopher | Jacked installation of underbridges | 118-126 |
Takeichi, Shuichi / Terada, Kazumi / Saito, Daisuke | Low-impact cable system adopted for the Awa Shirasagi Ohashi Bridge, Japan | 106-117 |
Stroscio, Riccardo / MacCombe, Jaime / Casewell, Andy / Francescon, Mike | unconventional viaduct design for the A82 road widening | 127-140 |