PCI Journal - v. 40, n. 2 (mars 1995)
Publié: | mars 1995 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Pessiki, Stephen / Prior, Richard / Sause, Richard / Slaughter, Sarah / van Zyverden, Willem | Assessment of Existing Precast Concrete Gravity Load Floor Framing Systems | 70-83 |
Hofmeister, W. Steven / Clark, Brad A. / Ciulis, John | Cleveland's State-of-the-Art Gund Arena Answers Design-Construction Challenge | 24-35 |
Englekirk, Robert E. | Development and Testing of a Ductile Connector for Assembling Precast Concrete Beams and Columns | 36-51 |
Ghosh, S. K. | Observations on the Performance of Structures in the Kobe Earthquake of January 17, 1995 | 14-22 |
Pessiki, Stephen / Prior, Richard / Sause, Richard / Slaughter, Sarah | Review of Existing Precast Concrete Gravity Load Floor Framing Systems | 52-68 |
Buckner, C. Dale | A Review of Strand Development Length for Pretensioned Concrete Members | 84-105 |
Loo, Y. C. / Yao, B. Z. | Static and Repeated Load Tests on Precast Concrete Beam-to-Column Connections | 106-115 |