Minutes of the Proceedings of the Institution of Civil Engineers - v. 214, n. 1922-2 (1922)
Publié: | 1922 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Willox, W. | All-Electric Automatic Power Signalling on the Metropolitan Railway | 55-76 |
Walker, R. D. | The Causes and Prevention of Defective Track on Tropical Railways | 272-277 |
Hadfield, R. A. | Corrosion of Ferrous Metals: Part I: Manufacture & Mechanical Properties of the Ferrous Metals Used in the Research / Part II: Theories of Corrosive Action and the Behaviour of Special Materials | 83-171 |
Bairstow, L. / Pippard, A. J. S. | The Determination of Torsional Stresses in a Shaft of Any Cross Section | 291-332 |
Cullen, E. A. | The Improvement of the Brisbane River | 278-286 |
Walsh, A. C. / Stanton, W. F. | The Improvement of the Port of Valparaiso | 3-25 |
Stephen, F. W. | The Nile Water-Supply to Palestine for the Egyptian Expeditionary Force | 346-357 |
Colman, H. M. | River Causeways | 287-290 |
Aspinall, J. A. F. | Some Post-War Problems of Transport: James Forrest Lecture, 1922 | 235-271 |
Dare, H. H. | The Spillways of Burrinjuck Dam | 333-345 |