Journal of Construction Engineering and Management - v. 118, n. 1 (mars 1992)
Publié: | mars 1992 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Griffis, F. H. (Bud) | Bidding Strategy: Winning over Key Competitors | 151-165 |
Burati, James L. / Farrington, Jodi J. / Ledbetter, William B. | Causes of Quality Deviations in Design and Construction | 34-49 |
Turner, John P. | Constructability for Drilled Shafts | 77-93 |
Sanvido, Victor / Grobler, Francois / Parfitt, Kevin / Guvenis, Moris / Coyle, Michael | Critical Success Factors for Construction Projects | 94-111 |
Thomas, H. Randolph | Effects of Scheduled Overtime on Labor Productivity | 60-76 |
Kerr, William C. / Tamaro, George J. / Hahn, Daniel M. | Exchange Place Station Subsurface Reconstruction and Improvements | 166-178 |
Gibson, George E. / Bell, Lansford C. | Integrated Data‐Base Systems | 50-59 |
Hanna, Awad S. / Willenbrock, Jack H. / Sanvido, Victor E. | Knowledge Acquisition and Development for Formwork Selection System | 179-198 |
Herbsman, Zohar / Ellis, Ralph | Multiparameter Bidding System—Innovation in Contract Administration | 142-150 |
Burati, James L. / Matthews, Michael F. / Kalidindi, Satyanarayana N. | Quality Management Organizations and Techniques | 112-128 |
Bröchner, J. / Grandinson, B. | R&D Cooperation by Swedish Contractors | 3-16 |
Cushman, Nancy S. / Nam, C. H. / Tatum, C. B. | Technology Transfer in Building Construction—Case of Seismic Design | 129-141 |
Roseefeld, Yehiel / Warszawski, Abraham / Laufer, Alexander | Using Quality Circles to Raise Productivity and Quality of Work Life | 17-33 |